01.11.2011 | ENGESER GmbH safeguards site in the long-term

Investment in new building and renewable energies in Waldmössingen


The new factory 4 in Seedorfer Str. 76, Schramberg, Waldmössingen has more than 1,000m2 of manufacturing and storage space. There are also 65 new parking spaces for ENGESER GmbH employees.

The new factory has been in operation since 1 July 2011. High-quality cable sets with new technologies for automotive electrical drive systems used in the high-voltage and capital goods sectors are produced in manufacture and assembly cells.

 

This is based on long-term framework agreements. The previous premises would not have been large enough to accommodate the considerable order volume. When completed, the new capacities will accommodate some 30-40 high-quality workstations.

In factory 4, ENGESER is promoting renewable energies. The photovoltaic system with 45 KwP ensures environmentally friendly energy generation, saves natural resources and reduces CO2 emissions on a sustained basis.

The ENGESER Group has a production area spanning more than 10,000 m2 and currently has a workforce of more than 400 employees working at its five sites in Schramberg-Waldmössingen (Germany) and Havlíčkův Brod (Czech Republic).

zurück zur Übersicht

 

Our addresses

ENGESER GmbH
Innovative Verbindungstechnik

Angelwasenstr. 22 + 27

D-78713 Schramberg

Tel. +49 7402 9201-0

Fax +49 7402 9201-150

info@engeser.com

 

ENGESER GmbH
Kabeltechnik 

Angelwasenstr. 22 + 27

D-78713 Schramberg

Tel. +49 7402 9201-0

Fax +49 7402 9201-150

info@engeser.com

 

ENGESER s.r.o.

Okru˛ní 3834

CZ-Havlíčkův Brod

Tel. +420 569 430 911

Fax +420 569 430 910

info@engeser.cz